Three infrastructure projects were signed on Sunday at the Victoria Palace, in the presence of PM Viorica Dancila, one of them regarding the design and execution of the 1st segment of the Sibiu-Pitesti Motorway.
The design and execution agreement for the Sibiu-Pitesti Motorway, segment 1 Sibiu-Boita, was signed by the representative of the National Company of Administration of Road Infrastructure SA (CNAIR), Narcis Neaga, and the manager of Porr Construct SRL.
The second agreement - regarding the design and execution of the 3rd part of the Bucharest City Belt, the southern segment - was signed by Narcis Neaga, the general manager of Aktor SA and the special manager of Euro Construct.
The third agreement, regarding the traffic safety and automation system for Subway Line 5, the Raul Doamnei-Eroilor segment, was signed by the general manager of Metrorex, Dumitru Sodolescu, and the general manager of Alstom Transport SA.
At the respective ceremony, the Minister of Transport, Razvan Cuc, mentioned that all three agreements are very important for the Romanians.
"The first agreement refers to a very important motorway long desired by the Romanians - the Pitesti-Sibiu motorway, Boita-Sibiu segment. Ever since my first term in office as Minister I understood that crossing through the Carpathians is a priority for Romania's economic development. This meaning that the Boita-Sibiu segment is not just another segment of a motorway, which is why, in 2017, the ALDE-PSD (Alliance of Liberals and Democrats and the Social Democratic Party) unblocked and launched the acquisition procedure for the first parts of the Sibiu-Pitesti motorway. The agreement is worth more than 612 million lei, without VAT, the equivalent of 129 million euros, with works to take 48 months, 12 of which will be needed for the design stage and 37 for the execution stage. The second agreement refers to the 3rd segment of the Bucharest City Belt, the southern section. The agreement is worth more than 853 million lei, the equivalent of 180 million euros, without VAT. (...) This segment is part of the southern section of the Bucharest City Belt, which will ensure the connection with the TEN-T network and also make the connection between motorway A1 Pitesti-Bucharest and motorway A2, Bucharest-Constanta," specified Cuc.
He also added that the third agreement, the one regarding Subway Line 5, refers to the traffic safety and automation system, including the safety system to be found on board of the train and the dynamic information system.
The Minister of Transport told constructors he won't tolerate any more excuse.
Victoria Palace: Three infrastructure agreements signed for motorways and Subway Line 5
Explorează subiectul
București
9°C
Articole Similare

14
INS: Romania counts 113,303 enterprise groups in 2024, 108,401 of them multinationals
14

16
Survey: 75% of Romanian employees feel financial pressure, over a third seek extra income
16

18
PM Bolojan: Romania does not need a political crisis at the moment, it needs stability
18

22
Hanwha Aerospace allocates 1.3 billion euro to strengthen Romania's sovereign defence capabilities
22

18
ForMin Toiu attends informal meeting of the Foreign Affairs Council in Kyiv
18

13
Project on effective use of EU funds, sustainable development to be launched in Bucharest
13

16
Albanian PM: Aims to conclude EU accession talks by 2027, join by decade's end
16

11
PM Bolojan: EU's eastern border must be stronger; we need to strengthen both military and economic security
11

13
INTERVIEW/U.S. ambassador to Bucharest: Our partnership has never been stronger, we aim to advance economic opportunities
13

17
Number of building authorisations issued for residential buildings down 8.4% in January-February
17

13
Prime Minister Bolojan warns of tougher 2026, cites Middle East impact on economy
13

19
PM Bolojan and EC Executive Vice-President Minzatu discuss boosting PNRR commitments and cohesion funds
19

35
Bolojan: Government to cut fuel excise, diesel prioritised
35
















Comentează