Romanian railway lines are in a state that varies from deplorable to reasonable, their traffic management continues to be done by radio and telephone, and the average commercial speed at which they are run is 30-40 km/h, reveals a recent sustainability and efficiency study of the Romanian railway network, unveiled on Tuesday in a videoconference by the Authority for Railway Reform (ARF).
According to the conclusions, the existing signalling systems on the Romanian railway are outdated, mechanical, and key operated. At the same time, the systems are electro-mechanical or electrical centralised.
Also, few of the level crossings are provided with protection, while many of the speed restrictions are caused by the condition of the bridge line, visibility or embankments.
The study also shows that on the railway lines operated by private companies use is being made of used diesel units purchased from France, the Netherlands and Germany, and frequency oscillates between 6 and 10 train sets per day.
At the same time, on the lines operated by CFR Calatori, old or very old diesel units run, namely a locomotive with one or two cars, at an operation frequency of between two and seven sets of trains a day.
Regarding the technical conditions of the Romanian railway lines, data centralised by the study show that the rail is in a state that varies "from deplorable to reasonable," and in the case of bridges and drainage systems there are very high maintenance arrears. At the same time, the railway stations and stops are said to be in a state ranging "from primitive to good."
The purpose of the study was to analyse the future use of 113 lines and line sections of a total length of 3,852 km. Out of the total lines analysed, 97 are part of the non-interoperable infrastructure, and 16 are part of the interoperable infrastructure.
The value of the project for carrying out the specialist study amounted to 5,259,531 lei, with the funds being allocated from non-repayable external funds under the financial framework 2014 - 2020, of which 85% under the Operational Programme Large Infrastructure (POIM) and 15% from the national budget.
On Tuesday, ARF representatives presented the conclusions of the study on the sustainability and efficiency of the Romanian railway network, together with members of the multinational consortium that carried it out, composed of SC Synergetics Corporation SRL (Romania), Panteia B.V. (Netherlands), Railistics GmbH (Germany) and AV Transport Planning SRL (Romania).
Report finds Romanian railway lines in "deplorable to reasonable" state
București
12°C
Articole Similare

11
FinMin: Pre-completed Single Declaration and 3% bonus - two concrete measures for digitalisation and simplification
11

14
President Nicusor Dan: Prolonged cyberattack network disrupted; Russia is continuing hybrid war
14

13
EconMin: Strict rules for recruitment agencies; foreign workers employment - aligned with real needs
13

9
Psychological support for parents, legal guardians of children with Down syndrome or autism spectrum disorder
9

14
Csoma Botond: UDMR position - clear, we want political stability, we do not need political crisis as well
14

8
Emanuel Parvu, among eight filmmakers selected to present their next film project at Investors Circle
8

14
Cold spell, mixed precipitation, strong wind to grip most of Romania through Friday morning
14

12
Turnover in retail trade down 7.6pct in first two months of 2026
12

10
Seante Chair Abrudean: A nation is strong when everyone has a chance to build their own path
10

29
Romania's Ruse to play Yastremska in Linz Open R16
29

17
"B.P. Hasdeu" National College of Buzau represented to FIRST Tech Challenge World Championship in Houston
17

37
RO-ALERT message in north Tulcea County as 17 drones detected in border area
37

34
Romania's Cirstea reaches Linz Open doubles QFs
34
















Comentează