Truck queues formed since last week on the border with Hungary, after the neighboring country introduced a new computer system used by the border authorities, are still there on Monday, heavy-duty trucks having to wait for three hours to go through the border checkpoints.
The representatives of the Arad Border Police declared for AGERRPRES that the long waiting times for the border crossing procedures from Romania to Hungary are mainly caused by "the entry into use of the new information system belonging to the Hungarian authorities", information that also appears on the online border traffic monitoring app on the Border Police website.
At Nadlac II, the crossing point on the pan-European motorway, the queue of trucks is about five kilometers, and the waiting time for leaving the country on the four lane open for heavy-duty vehicles is at least 180 minutes.
At Nadlac I the waiting time is at least 90 minutes, and at Varsand - 180 minutes.
In Bihor County, according to the Border Police app, waiting time is 100 minutes at Bors I and 40 minutes at Bors II, and in Satu-Mare County, at Petea, it is 180 minutes.
On the inbound, there is congestion only at Nadlac II, where waiting time is about an hour.
Authorities say light traffic is not affected, and there are no long waiting times for those traveling by car, bus or minibus.
At the beginning of last week, after the implementation of a new application for border control by the Hungarian authorities, at Nadlac II, waiting times were six hours on the outbound lanes for heavy-duty trucks, queues that exceeded 10 kilometers being formed on the pan-European motorway.
New computer system maintains truck queues at main checkpoints on border with Hungary
București
10°C
Articole Similare

15
INS: Romania counts 113,303 enterprise groups in 2024, 108,401 of them multinationals
15

18
Survey: 75% of Romanian employees feel financial pressure, over a third seek extra income
18

19
PM Bolojan: Romania does not need a political crisis at the moment, it needs stability
19

29
Hanwha Aerospace allocates 1.3 billion euro to strengthen Romania's sovereign defence capabilities
29

19
ForMin Toiu attends informal meeting of the Foreign Affairs Council in Kyiv
19

14
Project on effective use of EU funds, sustainable development to be launched in Bucharest
14

18
Albanian PM: Aims to conclude EU accession talks by 2027, join by decade's end
18

13
PM Bolojan: EU's eastern border must be stronger; we need to strengthen both military and economic security
13

20
INTERVIEW/U.S. ambassador to Bucharest: Our partnership has never been stronger, we aim to advance economic opportunities
20

17
Number of building authorisations issued for residential buildings down 8.4% in January-February
17

13
Prime Minister Bolojan warns of tougher 2026, cites Middle East impact on economy
13

19
PM Bolojan and EC Executive Vice-President Minzatu discuss boosting PNRR commitments and cohesion funds
19

35
Bolojan: Government to cut fuel excise, diesel prioritised
35
















Comentează